Bogdan's Head

One Slot Available: I Take Only 3 Projects At a Time to Ensure the Best Quality

E-book cover

hivo

hivo

UI & Design System

Hivo is a fictional project and team planner for small studios. The flows were already designed and working, but the product looked like an internal tool. I redesigned the interface for seven desktop flows and built the design system that holds them together.

Logomark of a block on green bg
Logomark of a block on green bg

the brief

the brief

A concept project with a clear split. The product team had already defined the flows and tested the UX. My job was everything people see: the visual direction, every screen, and the system behind them.

A concept project with a clear split. The product team had already defined the flows and tested the UX. My job was everything people see: the visual direction, every screen, and the system behind them.

The job in one line

Make a tool that already works look as credible as the price it charges.

Make a tool that already works look as credible as the price it charges.

What I was given

Working screens for seven desktop flows: dashboard, projects, project detail, new project, reports, team settings and inbox. Structure and journeys were signed off.

What I did

The visual direction, the UI for all fifteen desktop screens, and a design system with tokens, components and usage rules.

What I didn’t do

No user research and no flow changes. Where a layout moved, it was to make the hierarchy readable, not to change the journey.

the direction

the direction

The before screens were default HTML: grey bars, blue links, equal weight everywhere. The after had to feel calm enough to open twenty times a day.

The before screens were default HTML: grey bars, blue links, equal weight everywhere. The after had to feel calm enough to open twenty times a day.

Colour goes to state, not decoration. Lime means active or on track, orange means risk, and everything else is ink, white and warm paper. If something is coloured, it’s telling you something.

Colour goes to state, not decoration. Lime means active or on track, orange means risk, and everything else is ink, white and warm paper. If something is coloured, it’s telling you something.

Neutral by default

Paper, white and ink build every surface, so the screen stays quiet until something needs attention.

One highlight per screen

A single ink card carries the number that matters. Everything else stays white.

One grid

Four columns and 16 px gutters everywhere, next to the sidebar too. Blocks only change their span.

dashboard

dashboard

Before, the home screen was four tables of equal weight and nothing said what to do first. After, the week’s priorities read top to bottom in one glance.

Before, the home screen was four tables of equal weight and nothing said what to do first. After, the week’s priorities read top to bottom in one glance.

Before

After

One number leads

The ink card holds what matters this week: 14 tasks due. The other stats stay white and secondary.

Tasks you can act on

Today, Overdue and Upcoming become tabs, and each task can be ticked off right from the list.

Risk without alarm

Overdue work gets an orange dot and overloaded people an orange bar. No red banners.

projects

projects

A 22-row table where status was a word in a column. The same data now reads as cards you can compare at a glance.

A 22-row table where status was a word in a column. The same data now reads as cards you can compare at a glance.

Before

After

Cards over rows

Each project shows progress, due date and team in a four-column grid that reflows on smaller screens.

Status as a chip

On track, at risk and done use the two signals, so problems stand out in a second.

Filters that count

Active, At risk, Done and All show how many projects sit in each.

project detail

project detail

Key facts sat in a definition list above a flat task table. The new header answers “how is this going?” before you scroll.

Key facts sat in a definition list above a flat task table. The new header answers “how is this going?” before you scroll.

Before

After

Summary on top

Progress, due date, hours and the one thing that needs attention, in four cards.

Board view, styled

To do, In progress, Review and Done columns on warm paper, with List and Timeline one tab away.

Labels, not colours

Task types are neutral tags. Only late work picks up orange.

new project

new project

Same three steps the team designed: name it, start from a template, set a date. The UI makes those steps obvious and confirms what happened after.

Same three steps the team designed: name it, start from a template, set a date. The UI makes those steps obvious and confirms what happened after.

Before

After

After · project created

Visual weight follows the steps

Numbered sections and one primary button, so the dialog reads in order.

Templates as tiles

Blank, Website, Campaign and Sprint are tiles with the task count on each, and the selected one is unmistakable.

A clear confirmation

A toast says what was created and offers undo, and the new project opens with a short checklist.

reports

reports

Numbers lived in a table next to a default blue bar chart. Now the page leads with the trend and ends with the decisions.

Numbers lived in a table next to a default blue bar chart. Now the page leads with the trend and ends with the decisions.

Before

After

Four KPIs, one highlighted

Tasks delivered leads in ink. The rest are white cards with a one-line comparison.

Lime marks now

Ink bars, with the current week in lime, so the eye lands on this week first.

Decisions, not data

A side panel lists what a lead needs to act on, like who is over capacity.

team & settings

team & settings

An admin table with a link for every action and a loose block of checkboxes, rebuilt as a settings page that’s easy to scan.

An admin table with a link for every action and a loose block of checkboxes, rebuilt as a settings page that’s easy to scan.

Before

After

Settings in one list

Workspace, members, roles, notifications, integrations and billing sit in a left-hand nav.

Invite first

The most common task sits at the top, with seats used shown right next to it.

Quiet member rows

Each person shows role and projects. Only over-capacity gets a signal.

inbox

inbox

Messages were a three-column table and the content was a click away. Now the list and the conversation sit side by side.

Messages were a three-column table and the content was a click away. Now the list and the conversation sit side by side.

Before

After

List and thread together

Pick a notification and read the conversation without leaving the page.

Grouped by day

Today and Yesterday sections, with unread items marked by a single dot.

Act in place

Open task and Mark done live in the thread header.

the design system

the design system

Eight boards that document the rules behind every screen: one shell, two typefaces, six neutrals and two signals. The goal was a system the next designer can extend without asking.

Eight boards that document the rules behind every screen: one shell, two typefaces, six neutrals and two signals. The goal was a system the next designer can extend without asking.

what i delivered

what i delivered

A UI and design system package, ready to hand to engineering. The UX stayed as the team designed it.

A UI and design system package, ready to hand to engineering. The UX stayed as the team designed it.

7

Desktop flows redesigned

15

Screens designed

8

Design system boards

2

Signal colours, nothing more

See What's Actually Possible For Your Brand

30 minutes to map your project, your budget, and your timeline so you leave knowing exactly what this would take.

Bogdan's Head

One Slot Available: I Take Only 3 Projects At a Time to Ensure the Best Quality

Bogdan's Head

One Slot Available

spend less time on spend.

of HR leaders say their tools still can't keep up with headcount growth

See What's Actually Possible For Your Brand

30 minutes to map your project, your budget, and your timeline so you leave knowing exactly what this would take.

spend less time on spend.

of HR leaders say their tools still can't keep up with headcount growth

See What's Actually Possible For Your Brand

30 minutes to map your project, your budget, and your timeline so you leave knowing exactly what this would take.