UI & Design System
Hivo is a fictional project and team planner for small studios. The flows were already designed and working, but the product looked like an internal tool. I redesigned the interface for seven desktop flows and built the design system that holds them together.
The job in one line
What I was given
Working screens for seven desktop flows: dashboard, projects, project detail, new project, reports, team settings and inbox. Structure and journeys were signed off.
What I did
The visual direction, the UI for all fifteen desktop screens, and a design system with tokens, components and usage rules.
What I didn’t do
No user research and no flow changes. Where a layout moved, it was to make the hierarchy readable, not to change the journey.
Neutral by default
Paper, white and ink build every surface, so the screen stays quiet until something needs attention.
One highlight per screen
A single ink card carries the number that matters. Everything else stays white.
One grid
Four columns and 16 px gutters everywhere, next to the sidebar too. Blocks only change their span.
Before

After

One number leads
The ink card holds what matters this week: 14 tasks due. The other stats stay white and secondary.
Tasks you can act on
Today, Overdue and Upcoming become tabs, and each task can be ticked off right from the list.
Risk without alarm
Overdue work gets an orange dot and overloaded people an orange bar. No red banners.
Before

After

Cards over rows
Each project shows progress, due date and team in a four-column grid that reflows on smaller screens.
Status as a chip
On track, at risk and done use the two signals, so problems stand out in a second.
Filters that count
Active, At risk, Done and All show how many projects sit in each.
Before

After

Summary on top
Progress, due date, hours and the one thing that needs attention, in four cards.
Board view, styled
To do, In progress, Review and Done columns on warm paper, with List and Timeline one tab away.
Labels, not colours
Task types are neutral tags. Only late work picks up orange.
Before

After

After · project created

Visual weight follows the steps
Numbered sections and one primary button, so the dialog reads in order.
Templates as tiles
Blank, Website, Campaign and Sprint are tiles with the task count on each, and the selected one is unmistakable.
A clear confirmation
A toast says what was created and offers undo, and the new project opens with a short checklist.
Before

After

Four KPIs, one highlighted
Tasks delivered leads in ink. The rest are white cards with a one-line comparison.
Lime marks now
Ink bars, with the current week in lime, so the eye lands on this week first.
Decisions, not data
A side panel lists what a lead needs to act on, like who is over capacity.
Before

After

Settings in one list
Workspace, members, roles, notifications, integrations and billing sit in a left-hand nav.
Invite first
The most common task sits at the top, with seats used shown right next to it.
Quiet member rows
Each person shows role and projects. Only over-capacity gets a signal.
Before

After

List and thread together
Pick a notification and read the conversation without leaving the page.
Grouped by day
Today and Yesterday sections, with unread items marked by a single dot.
Act in place
Open task and Mark done live in the thread header.








7
Desktop flows redesigned
15
Screens designed
8
Design system boards
2
Signal colours, nothing more




